Latency Is Not Idleness

2 March 2026 · Sipho Mahayi, principal property practitioner

A municipal plans examiner spends most of the day comparing drawings with rules, checking where the building lines fall, what the zoning scheme allows on that stand and whether the structure meets the national building regulations. It is slow, careful desk work, and it happens during the stretch of a building project that owners find hardest to bear, when nothing seems to be happening on site.

Before a plan reaches that desk, a draughtsperson or architect has measured the existing house and drawn the new work, and an engineer may have signed off the slab or the roof. Comments can come back asking for changes, and each round adds weeks. From the street it looks like a project that has stalled.

What is really going on is that mistakes are being caught where they are cheap. A garage drawn over a building line is fixed with a new drawing. The same garage built over the line can bring an order from the municipality to alter it, and a neighbour who objects may well be in the right. So the weeks of waiting are where the expensive surprises get found while they still cost only paper.

From the Dispatch to your door

Want to know what your home is worth?

Scroll to Top